• Centrale hydroélectrique Inga (RDC)
    Centrale hydroélectrique Inga (RDC)
  • Zone PEAC
    Zone PEAC
  • Projet LOM PANGAR (Cameroun)
    Projet LOM PANGAR (Cameroun)
  • Poste sur la section Imboulou-Ngo-Tsiélampo (RC)
    Poste sur la section Imboulou-Ngo-Tsiélampo (RC)
  • Lignes Sumbe-Gabela-Waku Kungo (Angola)
    Lignes Sumbe-Gabela-Waku Kungo (Angola)

This platform was built within the scope of the Technical Assistance Mission (MAT2) and Capacity Building  for the  Central Africa Power Pool (CAPP) funded by the European Union and developped by IED.

The overall objective of the establishment of the Internet / GIS platform electrification and interconnections countries PEAC area is to strengthen the impact of interconnections (regional border) on access to the electrical service. This platform offers some information on the energy sector of member countries numbers. The infiormation provision will monitor the situation of energy exchanges in the area and have relevant indicators to promote new projects and monitor the progress of ongoing projects.


This web platform offers various functionalities in order to:

  •      view the existing and projected transmission network
  •      compare countries indicators
  •      provide real-time information validated by the member countries and the permanent secretariat of CAPP

The platform uses special technology of Geographic Information Systems to offer a cartographic interface of data.

 RESPONSIBILITY

CAPP and IED make every effort to provide visitors with reliable information. However, they can not guarantee to users the accuracy, completeness and timeliness of the information provided and the availability of the online GIS tool. Consequently, the responsibility oof IED and  PEAC can not be engaged due to the use of this information and / or tools provided on this website.

 

WEB DESIGN

 This website has been developped by Innovation Energie Développement, FranceIED

The action is performed on the basis of collaboration with states and CAPP member companies whose respective roles are clearly defined in line with the actual powers and capacities in terms of implementation and management of energy infrastructure.

 

image002

Angola

Empresa Nacional de Electricidade - ENE-EP

Empresa de Distribucaode Electricidate - EDEL

image004

Burundi

Régie de Production et de Distribution d'Eau et

d'Electricité – REGIDESO

cameroun

Cameroon

Energy of Cameroon - ENEO

Centrafrique

Centrafrique

Energie Centrafricaine - ENERCA

Congo

Congo

Société Nationale d'Electricité – SNE

Gabon

Gabon

Société d'Eau et d'Energie du Gabon – SEEG

Guinee Equatoriale

Equatorial Guinea

Sociedad de Electricidad de Guinea Ecuatorial – SEGESA

RD congo

R.D. Congo

Société Nationale d'Electricité –SNEL

Sao tome Principe

Sao Tomé & Principe

EMpresa de Agua e Electricidade - EMAE

Tchad

Tchad

Société Nationale d'Electricité Tchad- SNE

The Central Africa Power Pool (CAPP) is a specialized agency of the Economic Community of Central African States (ECCAS). He is responsible for the implementation of energy policy, monitoring studies and construction of community infrastructure and the organization of exchanges of electric energy and related services in the ECCAS area.

 organigramme

 

Due to its central role in the sub-region, the Permanent Secretariat is responsible for ensuring that the GIS information is up to date to provide transparent information and as comprehensive as possible to members of the Pool, donors and public more generally on the situation of regional interconnections and available production capabilities.